 Click to enlarge | | October 1, 2001: Athletic Director Dinky Phipps in front of the Activity Center/Gym. Roof joists have been installed over the weight room, dressing rooms, and class rooms. Interior block work is in the finishing stages while the exterior is being bricked. Anchor bolts have all been installed.
|
 Click to enlarge | | October 14, 2001: Tech Specialist Jeff Banfield and his son Jeffery in front of the Activity Center/Gym. One third of the concrete gym floor is in place. The steel for the actual gym itself has arrived and brick is being installed. Plumbing and electrical rough ins on the first floor are completed and now being installed on the second floor.
|
 Click to enlarge | | October 29, 2001: Lifetime Tigers & BHS staff Linda Elam and Kay Burgess. The structural steel for the pre-engineered portion of the Activity Center/Gym project are being installed. The actual steel for the gymnasium should be set by the middle of next week. Electricians, plumbers, and brick/block masons continue to make good progress on the locker room areas.
|
 Click to enlarge | | November 5, 2001: Lifelong Tiger (and 5th & 6th Grade teacher) Pat Phipps in front of the Activity Center. The pre-engineered steel is amost completely installed while the block/brick masons strive to keep laying block and brick during these beautiful days of fall.
|
 Click to enlarge | | November 12, 2001: VENCIL "BIG V' PHIPPS. The masons continue to block the Activity Center while the heating and air conditioning systems are being installed. It has been a beautiful fall season for the construction activities.
|